Moving to DLF Phase 1 to 5, Gurgaon: sectors, metro, the sealing drive and utilities
Moving to DLF City Phases 1 to 5 in Gurgaon: the sectors they cover, Rapid Metro, who runs civic services, the 2026 sealing drive and setting up utilities.
Short answer
DLF Phases 1 to 3 lie in Sectors 24, 25 and 25A, Phase IV in 27, 28 and 43, and Phase V in 42, 43, 53 and 54. Before renting a floor or a PG room, check the building is legal: the planning department sealed illegal PGs and extra floors here in 2026. The phases also flood in heavy rain.
Which sectors are the phases in?
| Phase | Sectors (DTCP licence records) | First licensed |
|---|---|---|
| Phases 1 to 3 | 24, 25 and 25A | 1982 |
| Phase IV | 27, 28 and 43 | 1989 |
| Phase V (now called DLF 5) | 42, 43, 53 and 54 | 1995 |
Phases 1, 2 and 3 are among DLF’s oldest colonies, developed from the early 1980s on roughly 590, 488 and 468 acres. Phase 1 runs along Golf Course Road.
Who looks after roads, water and sewers?
In 2017 the Haryana government decided that the Municipal Corporation (MCG) would take over Phases 1, 2 and 3, and MCG had reports made to cost their roads, water supply, sewerage, drainage and streetlights. We found no record that the handover was completed; the planning department’s records show only part completion certificates. In practice it is mixed: MCG counts the DLF colonies as its Zone VI, MCG’s records showed water bills in Phases 1 to 3 in 2023, and in January 2025 DLF management cut the water and sewer connections of 81 Phase 5 units whose occupancy certificates were revoked. Ask the landlord or the RWA who bills water and whom to call about sewers, garbage and streetlights.
Check the building before you rent
The Department of Town and Country Planning (DTCP) has been acting against illegal construction and commercial use in houses across DLF Phases 1 to 5:
- By June 2026 it had issued over 5,099 notices, and Phase 3 accounted for about 60% of the flagged plots.
- Its June 2026 advisory gave occupants of illegal PGs, guest houses and offices until 30 June to move out, and urged tenants to check the legal status of their premises.
- When it sealed one building in Phase 3’s S Block that month, about 40 families had around two hours to remove their belongings.
- On 7 September 2026 the High Court held that this enforcement is DTCP’s job, and on 13 October 2026 the Supreme Court stayed the drive. We could not confirm the outcome of the later hearings.
Before you sign for a floor, a PG room or a converted stilt, ask the owner for the occupancy certificate and the sanctioned plan, check that the unit you are renting is on them, and ask whether the property has a DTCP notice.
How does it connect, and is there a metro?
Rapid Metro’s first phase is a 5.1 km loop from Sikandarpur to Cyber Hub, running since 14 November 2013, with stations at Phase-1, Phase-2, Phase-3 and Moulsari Avenue. At Sikanderpur it meets Delhi Metro’s Yellow Line and Rapid Metro’s Golf Course Road line. Near Phase IV, GMDA approved an underpass at the Millennium City Centre junction of Sectors 27 to 29 and 43 to 44 in November 2026, with an 18-month build, and the one-way traffic on the Galleria and Vyapar Kendra roads in Sectors 27 and 43 stays. On NH-48, the state has cleared DLF’s proposal for a flyover and underpass near Ambience Mall; it has no start date.
What should I know for moving day?
- We found no standing rule on goods vehicles entering the DLF phases. For a move to Delhi, the Gurugram Traffic Police said that from 1 November 2026 commercial goods vehicles of BS-IV or lower may not enter Delhi, so ask the mover for a BS-VI, CNG or electric truck.
- In April 2026 DTCP removed more than 100 illegal gates, grills and barricades in Phases 1 and 2. Ask the RWA which gate a moving truck should use.
- DTCP says converted stilts have pushed residents’ cars onto the roads, so check where the truck can stand outside the house.
- Ask the RWA or society office what it needs before a moving truck arrives, such as the vehicle number, crew details or a booked service lift.
When is it worst?
MCG and GMDA named DLF Phases 1 to 5 among the worst-flooded areas after 115 mm of rain in 33 hours in July 2026, and MCG’s Zone VI, which covers the DLF colonies, had 30 of the city’s 155 waterlogging hotspots. In July 2025 water entered houses in Phase 3. GMDA desilted its Leg 1 drain, which takes the stormwater of Phases 1, 2 and 3, before the 2026 monsoon. Power has failed in heat and storms too: in the May 2024 heatwave Phases 1, 2 and 3 were short of water and power. If you move between July and September, keep a flexible date.
What do I set up after moving in?
- Electricity is supplied by DHBVN. To open a connection in your name, a tenant can use the rent deed as proof of occupancy; Haryana’s service rules give 3 to 15 days to release supply where no new line is needed.
- Ask the society or landlord who supplies water. GMDA takes new water connections online only in areas under its jurisdiction, and runs a tanker booking for colonies its pipelines do not reach yet.
- Your landlord files the tenant police verification, and the rent agreement is stamped under Haryana rules.
- Electricity: MCG’s 2017 reports say the power network in Phases 1, 2 and 3 was handed over to DHBVN, which maintains it, and DHBVN’s form lists a “DLF” sub-division. A group housing society in Phase V may take one bulk supply and bill flats itself, so ask. In October 2026 the regulator put a proposed private parallel licence for Gurugram on hold, so DHBVN remains the supplier.
- Water: GMDA’s bulk supply reaches DLF Phases I to IV from the Basai plant, and Phase V’s sectors fall in the Chandu plant’s range of Sectors 42 to 74. Who bills you depends on the phase, as above.
- Piped gas: PNGRB’s map, which is not to scale, places DLF City in Hindustan City Gas’s part of Gurugram. Each company keeps the pipelines it already had, so ask which one reaches your building.
Rents for this area are being collected: a range appears once we have 3 for a home size. How we collect our numbers
Frequently asked questions
Which sector is my DLF phase in?
By DTCP's licence records, Phases 1 to 3 are in Sectors 24, 25 and 25A, Phase IV in Sectors 27, 28 and 43, and Phase V (DLF 5) in Sectors 42, 43, 53 and 54.
Who do I call about water, sewers or streetlights in a DLF phase?
It depends on the phase. The 2017 plan for MCG to take over Phases 1 to 3 is not recorded as complete, MCG billed water there in 2023, and DLF management ran water and sewer connections in Phase 5 in 2025. Ask your landlord or RWA.
How do I avoid renting a building that gets sealed?
Ask the owner for the occupancy certificate and sanctioned plan, check that your floor or room is on them, and ask whether the property has a DTCP notice. DTCP has sealed illegal PGs, guest houses and extra floors in DLF Phases 1 to 5; the Supreme Court stayed the drive on 13 October 2026.
Can a moving truck take my things from a DLF phase to Delhi?
Yes, but since 1 November 2026 commercial goods vehicles of BS-IV or lower may not enter Delhi, by the Gurugram Traffic Police advisory. Ask the mover for a BS-VI, CNG or electric truck.
Does DLF City flood in the monsoon?
Yes. MCG and GMDA named DLF Phases 1 to 5 among the worst-flooded areas in July 2026, and water entered houses in Phase 3 in July 2025.
Sources
- DTCP Haryana: colony licence details (DLF Phases 1 to 5)
- HARERA Gurugram: DLF 5, earlier DLF City Phase V, Sector 54
- MCG: detailed project report, DLF City Phase 1, 2017 (PDF)
- MCG: detailed project report, DLF City Phase 2, 2017 (PDF)
- Tribune: DLF Phase 5 water and sewer connections cut, 14 Jan 2025 (news)
- Tribune: over 5,099 DTCP notices in DLF Phases 1 to 5, 19 June 2026 (news)
- Tribune: DTCP advisory to occupants of illegal PGs, 24 June 2026 (news)
- Tribune: sealing in Phase 3 leaves 40 families homeless, 19 June 2026 (news)
- Tribune: Supreme Court halts the DLF enforcement drive, 14 Oct 2026 (news)
- PMO: Rapid Metro phases and the Yellow Line in Gurugram, 7 June 2023
- PTI via Business Standard: Rapid Metro stations, 22 Oct 2019 (news)
- GMDA: Millennium City Centre underpass approved, Nov 2026
- Tribune: DLF flyover and underpass on NH-48 cleared, 20 Sept 2026 (news)
- Tribune: no entry to Delhi for BS-IV and older goods vehicles from 1 Nov 2026 (news)
- Tribune: illegal gates and barricades removed in DLF Phases 1 and 2, 21 Apr 2026 (news)
- Tribune: DLF Phases 1 to 5 among worst flooded, 10 July 2026 (news)
- GMDA: Leg 1 drain desilted before the monsoon, June 2026
- Tribune: parallel power licence for Gurugram put on hold, 28 Oct 2026 (news)
- PNGRB: city gas distribution authorisations (Gurugram-1 and Gurugram-2)
- DHBVN: documents for a new connection (PDF)
- DHBVN sales circular D-14/2025: Right to Service time limits, 29 July 2025 (PDF)