Independent guide: we don't move goods or take bookings. How we stay independent

DHBVN new connection in Gurugram: applying online, charges, documents and status

How to get a new DHBVN electricity connection in Gurugram: applying online, what a tenant needs, the charges the portal works out, time limits and status.

Reviewed by Anuradha GuptaLast updated How we collect our numbers

Short answer

Apply on DHBVN's new connection portal with an ID, a photo and proof that you own or occupy the home; a tenant can use the rent deed. On 17 Nov 2026 the portal's calculator put a 5 kW home with a DHBVN meter at ₹125 to apply plus ₹7,560, of which ₹3,750 is a refundable deposit. Supply is due within 3 to 15 days where no new line is needed.

Key findings

  1. ₹125 + ₹7,560 for a 5 kW home with a DHBVN meter, per the portal calculator on 17 Nov 2026
  2. ₹750 per kW security deposit, returned when you close the connection
  3. 3 to 15 days to release supply where no new line is needed (34 days where one is)
  4. Rent deed is the tenant's proof of occupancy DHBVN asks for; we found no owner-NOC rule

Does your society supply the power, or DHBVN?

DHBVN supplies Gurugram through two circles, Gurugram-I and Gurugram-II. But many flats are in group housing societies, and under HERC’s single point supply rules a walled society with 20 or more homes can take one bulk connection and run the power inside itself. The society, not DHBVN, then supplies and bills the flats. Flats get their own DHBVN connections when the society has opted for individual connections, so ask the society office first. Residents of a single point society keep the same rights as any DHBVN consumer.

How do I apply online?

  1. Open econnection.dhbvn.org.in and choose Apply. The form starts with your Family ID or Aadhaar number and a one-time password.
  2. Choose “New connection”, the category “Domestic (DS)” and “Permanent” supply, then your circle (Gurugram-I or Gurugram-II) and sub-division. If you don’t know the sub-division, the form’s link finds it from your area or colony.
  3. Fill in the address, the connected load in kW and your mobile number, which is checked with a 4-digit OTP. You also declare that a licensed electrical contractor wired and tested the home.
  4. Upload a photo under 50 KB and each document under 500 KB, self-attested, as .jpg, .jpeg, .png or .pdf files.
  5. Submit and note the application number. Pay the charges online, at the sub-division or through a CSC within 7 days, or the application is cancelled.

The sub-division then checks the documents, visits the site if it needs to, issues the demand notice by email and releases the connection.

What documents does a tenant need?

  • ID: a passport, PAN card, Aadhaar card, driving licence, ration card, voter ID, PPP ID or a government photo ID.
  • Proof of occupancy: the rent deed in your name. DHBVN’s list accepts a rent deed “or any other legal proof of being a tenant and paying rent”. If you have no document, a DHBVN official can confirm occupancy on site, for example from a water or sewer bill or the neighbours.
  • A landlord’s undertaking, witnessed by two neighbours, only if you want a separate connection in premises that already have one.

We found no DHBVN or HERC rule that asks for the owner’s NOC for a tenant’s own first connection.

What does a new connection cost?

Charge 2 kW, DHBVN meter 5 kW, DHBVN meter 5 kW, your own meter
Application processing fee ₹50 ₹125 ₹125
Security deposit (₹750 per kW, refundable) ₹1,500 ₹3,750 ₹3,750
Service connection charges ₹400 ₹2,500 ₹2,500
Meter cost ₹1,160 ₹1,160 ₹0
Meter installation ₹150 ₹150 ₹150
Meter box and meter testing ₹0 ₹0 ₹340
Demand notice charges ₹3,210 ₹7,560 ₹6,740

These are the figures DHBVN’s portal calculator gave on 17 Nov 2026 for a domestic connection, worked out without any extension of the network. The calculator shows the processing fee apart from the demand notice charges in the table; since August 2024 both can be paid when you apply. Service connection charges are ₹200 per kW up to 2 kW, ₹500 per kW for single phase above 2 kW and ₹1,000 per kW for three phase, and cover up to 150 metres of new line. Since 2022 you pay for the meter itself instead of a meter security, and there is no meter rent. A load above 5 kW needs a three-phase meter.

How long does it take, and who do I complain to?

Haryana’s Right to Service schedule, amended on 29 July 2025, gives 3 days in metropolitan areas, 7 days in municipal areas and 15 days in rural areas from a complete application with its charges and documents, or 34 days where the network has to be extended. The schedule does not say which of these applies in Gurugram. The officer responsible is the SDO (operations). If the connection is late, the first appeal goes to the XEN and the second to the SE.

How do I check the status?

On econnection.dhbvn.org.in, choose “Click here for consumer login”, enter your application number and generate an OTP. The portal also shows a public list of applications marked “Within Time” or “Beyond Time”. If you applied through SARAL, track the application on saralharyana.gov.in.

Can I apply without the website?

Yes. HERC rules let you apply on the paper form at the local DHBVN office, where help with the form is free. A printed form costs ₹20 if you buy it from DHBVN, and it can also be downloaded. You can also apply through the Antyodaya SARAL portal, or at a Saral Kendra or CSC, which charges a ₹30 service fee.

Should I choose a prepaid smart meter?

A new connection on a prepaid smart meter needs no security deposit, but you pay for the meter, and DHBVN offers it where it is feasible in your area. In some Gurugram sub-divisions the form asks you to choose a prepaid or postpaid smart meter. Switching from prepaid to postpaid later means paying the deposit.

The flat already has a meter: do I need a new connection?

No. An existing connection can be moved to a new name when the ownership or occupancy of the home changes: apply for a change of name with the latest paid bill. For a tenancy, the arrears and the advance consumption deposit must be cleared first, and the change takes up to two billing cycles. If you bought a home whose supply was cut, check that the previous owner holds a no-dues certificate from DHBVN.

How do I get the deposit back when I move out?

The security deposit earns interest each year. When you close the connection, DHBVN returns it within 30 days of settling all dues. Apply through “Apply for NDC/PDCO/Refund of Security” on the portal, or use SARAL’s refund service, which has a 30-day time limit.

Frequently asked questions

Can a tenant get a DHBVN connection with only a rent agreement?

Yes, for proof of occupancy. DHBVN accepts a rent deed in your name, together with an ID and a photo. We found no rule asking for the owner's NOC for a tenant's own first connection; a landlord's undertaking is needed only for a separate connection in premises that already have one.

My society bills me for electricity. Can I get my own DHBVN meter?

Only if the society has opted for individual connections. A walled society with 20 or more homes can take a single point bulk supply and distribute the power itself, and then DHBVN does not connect flats one by one. Ask the society office which system it uses.

How much is the security deposit, and do I get it back?

For a home it is ₹750 per kW of connected load, so ₹3,750 for 5 kW. It earns interest each year, and DHBVN returns it within 30 days of settling all dues when you close the connection.

What happens if I don't pay the charges after applying online?

The portal cancels the application if the charges are not paid within 7 days of applying.

How do I work out the load to apply for?

DHBVN counts 11 watts per light point and 60 watts per fan point, each for half the points, the full rating of up to two ACs and two geysers, and 1,000 watts per 15-amp socket other than those for ACs and geysers. Up to 5 kW gets a single-phase meter; above 5 kW, a three-phase meter.

What is the DHBVN helpline?

Dial 1912 or 1800-180-4334. For problems with a new connection application, DHBVN gives the email dhcomplaints@dhbvn.org.in.

Sources

  1. DHBVN new connection portal
  2. DHBVN: online application form for a new connection
  3. DHBVN: documents required for a new connection (PDF)
  4. DHBVN: compendium of commercial instructions, HERC regulations, Dec 2024 (PDF)
  5. DHBVN sales circular D-14/2025: Right to Service time limits, 29 July 2025 (PDF)
  6. DHBVN: track a new connection application
  7. DHBVN: procedure for working out the connected load (PDF)
  8. DHBVN: about the company and its circles
  9. Antyodaya SARAL: services and time limits

Who wrote and checked this page

Reviewed by Anuradha Gupta

Anuradha Gupta reviews moving companies independently and writes practical guides that help families plan a move, check a mover and avoid common mistakes. She reviews each guide on this site before it is published.

About Anuradha Gupta

Our editorial policy

Last updated Request a correction